Home › Resources › Beyond the 8130-3

EASA Part 145

Beyond the 8130-3: why US repair stations fail EASA audits

Under the BASA, the FAA audits your EASA approval. Here is what MAG Change 10 changed, where dual releases go wrong, and the five findings that keep coming back.

By Alain François, Aero ConsultingUpdated October 2026
FAA Form 8130-3 dual release and EASA audit findings at US repair stations

For a repair station in Miami, Orlando or Tampa, a single documentation error can turn into an AOG: a part rejected on arrival in Frankfurt or Paris, while the customer's aircraft waits. Under the EU–US Bilateral Aviation Safety Agreement (BASA), US repair stations can hold an EASA Part 145 approval without a separate EASA audit: the FAA oversees them on EASA's behalf, using the Maintenance Annex Guidance (MAG). That makes the FAA audit, and the paperwork behind it, decisive.

What changed with MAG Change 10

MAG Change 10 took effect on October 10, 2025. It added a new special condition: EASA-approved US repair stations must have a Safety Management System (SMS) that meets 14 CFR part 5, through the FAA SMS Voluntary Program, together with a declaration of compliance signed by the Accountable Manager. Stations already holding an EASA approval had until December 31, 2025 to comply. New applicants have been subject to the requirement since February 10, 2025.

Key point

The EASA special conditions are listed in MAG Section A, 5.1.1 and 5.1.2. Your EASA Supplement must reflect the current MAG change, and the FAA audits it against that version.

The dual release: where most errors happen

When a US repair station releases a component for an EU customer, it issues an FAA Form 8130-3 with a dual release. FAA Order 8130.21H, paragraph 3-5a(2), sets out what the form must contain:

  • Block 12: the EASA release statement, word for word: "Certifies that the work specified in Block 11/12 was carried out in accordance with EASA Part 145 and in respect to that work the [article] is considered ready for release to service under EASA Part 145 approval no. [EASA 145-XXXX]".
  • Block 14a: both boxes checked, 14 CFR 43.9 and "Other regulation specified in Block 12".
  • Block 14c: the FAA repair station certificate number.

The most frequent defects are a missing or reworded EASA statement, the wrong Block 14a boxes, maintenance data not referenced, and a release signed by someone the station has not authorized for EASA work.

Five findings that keep coming back

Audit findings repeat from one station to the next. When the US Department of Transportation's Office of Inspector General reviewed 27 repair stations and 119 work orders (report AV-2013-073), it found errors in 57 of the 119 work orders, and inaccurate training records at 21 of the 27 stations. Combined with the EASA special conditions, the same five themes appear again and again:

  1. Training records that do not prove competence. Staff cannot show training for the task they signed, recurrent human factors training is overdue, or no one has been trained on the EASA Supplement.
  2. Work orders and releases with errors. Maintenance data not recorded, unauthorized sign-offs, incorrect dual releases.
  3. Maintenance data and airworthiness directives not under control. Repairs on EU products without EASA-approved data, EASA ADs not tracked alongside FAA ADs.
  4. Tools out of control. Calibration overdue, missing tools not traced (13 of 27 stations in the OIG review).
  5. A Supplement that lags behind the MAG. Not revised for Change 10, internal audits that skip the special conditions, no SMS.

How Aero Consulting helps

Your station keeps full responsibility for its approval and its releases: only your authorized certifying staff can sign an 8130-3. Our role is to help you get there with confidence.

  • Gap analysis: an independent review of your procedures, Supplement and sample work orders against the current MAG, with a prioritized action plan.
  • Dual release training: practical training for your certifying staff on the EASA special conditions and the 8130-3 dual release. Your station then authorizes them under its own procedures.
  • Pre-audit review: a mock audit before the FAA visit, so findings are closed before the auditor sees them.

Start with our free FAA–EASA BASA Quick Guide, or see our EASA approval support for repair stations.

This article is general guidance. It does not replace the MAG, 14 CFR parts 43 and 145, FAA Order 8130.21 or your accepted EASA Supplement.

AF
Alain François

Founder of Aero Consulting. Former OSAC-approved Quality Manager for an EASA Part-145 and Part-CAMO organization, airline pilot (French ATPL, FAA Commercial Pilot) and instructor in EASA Part 21, Part 145 and Part-CAMO at ESTACA aerospace engineering school.

Preparing for your next FAA audit?

Tell us about your station and your EASA customers: we will help you find the gaps before the auditor does.

Version imprimable | Plan du site
© Aero Consulting – Conseil, audit et formation en réglementation aéronautique EASA depuis 2005. France, Europe, États-Unis, Afrique, Océanie. Tél. +33 (0)6 19 35 38 81